H-61, Third Floor, Sector-63
Noida, UP-201301
Surge/Impulse winding testing should be performed as a routine during the production and also when wound components (magnetics, motors) are serviced. … However, if the surge test is used to find the material fault at the production stage then life time of the electric motor is increased.